Groundtruth

What the public record shows

Living near the Seaport building boom

The Seaport has been Boston's largest continuous construction zone for a decade, with active permits and a deep approved-project pipeline.

Everything below is a recorded finding from Groundtruth's data layers, sampled at 3 points along this corridor on Jul 16, 2026, each with its public source. These numbers move block by block: run your exact address for the full six-pillar report.

Rail noise, modeled

51–53 dB

An estimate for spotting problems, not a measurement. Registered at 2 of 3 sampled points. 24-hour average, national noise model (BTS).

Aviation noise, modeled

52–56 dB

An estimate for spotting problems, not a measurement. Registered at 3 of 3 sampled points. 24-hour average, national noise model (BTS).

Road noise, modeled

55–64 dB

An estimate for spotting problems, not a measurement. Registered at 2 of 3 sampled points. 24-hour average, national noise model (BTS).

Noise sources on record

Construction & development on record

major120 ft SE

Planned development: Seaport Square - Block G

Large Project that is board-approved — 650,000 sq ft, $650M estimated cost. Block G at 120 Seaport Boulevard was approved in the 2017 NPC of Seaport Square as a residential and retail building. The 2022 NPC proposes a change to office/research uses with retail and civic ground floor space. Last filed 5/6/2022.

Source: Boston Planning (BPDA) — Article 80 Development Projects · retrieved Jul 16, 2026

major436 ft SE

Planned development: Seaport Circle Project

Large Project that is board-approved — 626,800 sq ft, $460M estimated cost. This project includes the construction of a laboratory/research & development and office building and job training/non-profit center named Seaport Circle (the Project), located at 701 Congress Street in the South Boston Waterfront of Boston, Massachusetts (the Project Site). The Project Site includes a 0.96 surface parking lot on Parcel H, which is owned by the Massachusetts Port Authority (Massport), an adjacent 0.3 acres of undeveloped land, and a 1.26 acre parcel consisting of the Massachusetts Bay Transportation Authority (MBTA) Silver Line Way and land that includes the existing Boston Water and Sewer Commission Pump Station. The Project will construct a 13-story laboratory/research & development and office building located on Parcel H totaling approximately 587,000 GFA, a two-story job training/non-profit center on an adjacent parcel totaling approximately 16,000 GFA, and an elevated walkway that connects these two buildings and surrounding properties. Additionally, the Project will include commitments to improve the Silver Line Way station as well as other significant public realm improvements. Last filed 6/28/2022.

Source: Boston Planning (BPDA) — Article 80 Development Projects · retrieved Jul 16, 2026

major541 ft SW

Planned development: Seaport Square - Block L3 & L6

Large Project that is board-approved — 600 residential units, 1,069,575 sq ft, $750M estimated cost. The 2022 NPC revises the uses in Block L-3 to 150,000 square feet of Office/Research / 260,000 square feet Residential / 15,000 square feet of Retail and the uses in Block L-6 to 50,000 square feet of Office/Research / 290,000 square feet Residential / 15,000 square feet of Retail. Last filed 5/6/2022.

Source: Boston Planning (BPDA) — Article 80 Development Projects · retrieved Jul 16, 2026

major627 ft NW

Planned development: Seaport Square - Block D

Large Project that is board-approved — 499,400 sq ft. 88 Seaport will feature 18 floors with nearly 425,000 square feet of office space, approximately 60,000 square feet of retail on the first two floors, and 5,000 square feet of civic/cultural use. Last filed 2/7/2017.

Source: Boston Planning (BPDA) — Article 80 Development Projects · retrieved Jul 16, 2026

Getting around

info

Walkability: 17.2 / 20 (most walkable)

The EPA National Walkability Index scores this census block group 17.2 out of 20 — in the "most walkable" band nationally. The index combines intersection density, proximity to transit stops, and the mix of jobs, homes, and destinations.

Source: EPA National Walkability Index · retrieved Jul 16, 2026

info

104 amenities within a 10-minute walk

Within a 5-minute walk: 1 grocery store, 32 restaurants, 4 bars, 2 gyms, 1 pharmacy, 9 parks, 1 school. Within 10 minutes: 3 grocery stores, 63 restaurants, 10 bars, 2 gyms, 1 pharmacy, 24 parks, 1 school.

Source: OpenStreetMap amenities (© OpenStreetMap contributors, via Geofabrik) · retrieved Jul 16, 2026

Neighborhood signals

notable

311 noise reports run about 9.4× the citywide rate

14 noise 311 cases were opened within 500 ft in the last 24 months — ~21 per sq mi per month here vs ~2.2 citywide. Most common: "Loud Parties/Music/People", "Undefined Noise Disturbance".

Source: Boston 311 Service Requests (Analyze Boston) · retrieved Jul 16, 2026

notable

311 parking reports run about 8.5× the citywide rate

666 parking 311 cases were opened within 500 ft in the last 24 months — ~985 per sq mi per month here vs ~116 citywide. Most common: "Parking Enforcement", "Abandoned Vehicles", "Parking Meter Repairs".

Source: Boston 311 Service Requests (Analyze Boston) · retrieved Jul 16, 2026

notable

311 noise reports run about 10× the citywide rate

15 noise 311 cases were opened within 500 ft in the last 24 months — ~22 per sq mi per month here vs ~2.2 citywide. Most common: "Loud Parties/Music/People", "Automotive Noise Disturbance".

Source: Boston 311 Service Requests (Analyze Boston) · retrieved Jul 16, 2026

This is the corridor. Your block is different.

Distance to the source decides most of these numbers. A Groundtruth report runs all sixteen layers against one exact address: noise, hazards, permits, transit, and neighborhood signals, scored and cited. Six scores and the top finding are free.

Run your address

Free preview first. No account.